Showing posts with label Storm repair. Show all posts
Showing posts with label Storm repair. Show all posts

Sunday, July 2, 2023

Chimney Rock Road temporary bridge now open

Public Works and Souza Construction, Inc. have completed the final stage of construction on the temporary bridge over the washout on Chimney Rock Road at Franklin Creek (near Fawn Lane).

The bridge opened to the public on Thursday afternoon. Residents and motorists are advised to use caution and adhere to advisory signs in the area including a strict 15-mph speed limit on and near the one-lane bridge. Please see map for the project location.

Winter storms between January and March 2023 washed out the culverts beneath Chimney Rock Road near Fawn Lane leading to an 80-foot-long and 50-foot-deep canyon bisecting the road. A temporary construction road across the creek bed was completed in April which provided access for construction, emergency, and residential vehicles. 

The temporary construction road has been closed and will be dismantled before the next rainy season. The new temporary bridge will remain in place until a permanent crossing is designed and constructed, expected between 2024 and 2025.

Sunday, April 2, 2023

Repair work scheduled for Chimney Rock Road

With no storms in the immediate forecast, County of San Luis Obispo Public Works is now able to begin repairs to Paso Robles’ Chimney Rock Road that was washed out during an early March atmospheric river event.


Steep terrain, unstable soils, rising lake levels, and a continuous stream of storms since March 9, have hampered repair efforts, and the break in weather means we will begin repairs on Monday, April 3.