The bridge opened to the public on Thursday afternoon. Residents and motorists are advised to use caution and adhere to advisory signs in the area including a strict 15-mph speed limit on and near the one-lane bridge. Please see map for the project location.
Winter storms between January and March 2023 washed out the culverts beneath Chimney Rock Road near Fawn Lane leading to an 80-foot-long and 50-foot-deep canyon bisecting the road. A temporary construction road across the creek bed was completed in April which provided access for construction, emergency, and residential vehicles.
The temporary construction road has been closed and will be dismantled before the next rainy season. The new temporary bridge will remain in place until a permanent crossing is designed and constructed, expected between 2024 and 2025.
No comments:
Post a Comment